Heating Modernisation in Berlin
Boiler replacement and system optimisation for your old building.
Over 70 % of heating systems in Berlin old-build properties are more than 20 years old and consume significantly more energy than necessary. We analyse your existing system, calculate the cost-effectiveness of different solutions and carry out the modernisation with minimal disruption – usually in 1–2 days.
Our services in detail
Why Montali?
We combine academic analysis with master craftsman excellence. This means: well-thought-out planning, efficient execution and communication you might not expect from a trade company. As a Berlin master craftsman company, we take responsibility – from subsidy consulting to final sign-off.
Heating Modernisation: What customers say on Google
„Mega Service bei Wärmepumpe! Brauchte kurzfristig vor der Sommerreise Hilfe. Wurde wirklich super beraten und trotz vollem Terminkalender noch eine Lösung gefunden. Habe Montali bereits meinen Eltern für deren komplette Haussanierung weiterempfohlen.“
vor 4 Monaten · Google
„Wir haben über Montali sowohl unsere Wärmepumpe als auch die PV-Anlage aus einer Hand umsetzen lassen und sind rundum zufrieden. Von der ersten Beratung bis zur finalen Inbetriebnahme lief alles sehr professionell, zuverlässig und transparent ab. Die Kommunik …“
vor 4 Monaten · Google
Reviews shown unedited from our Google Business Profile. All reviews on Google
Was kostet Heating Modernisation in Berlin?
Typische Kosten
3.000 – 15.000 €
Dauer
1 – 2 Tage
1 – 3 Wochen (inkl. Angebot und Lieferzeit)
Abhängig von neuem Heizsystem. Mit BEG-Förderung erhebliche Kostensenkung möglich.
Kostenfaktoren:
Frequently asked questions about Heating Modernisation in Berlin
Heating systems older than 15–20 years should be assessed. If efficiency is below 85 %, replacement is usually cost-effective – especially when subsidies can be claimed.
On average 20–40 % energy savings, depending on the old heating system and the new one. When switching to a heat pump, savings can be considerably higher.
Boiler replacement typically only takes 1 working day. For more complex systems we plan bridging measures so you do not have to go cold.
Heating Modernisation: projects from our work in Berlin
Denkmalgerechte Heizungssanierung
Pestalozzistraße, Charlottenburg
Berlin-Charlottenburg · 2025 · 9 Wochen
Wärmepumpe trotz Ensembleschutz, hydraulischer Abgleich mit Druckproblem, Bleirohr-Inliner in Bewohnerschaft – und zwei neue Designbäder in 9 Wochen.
- Heizkosten:
- –68 % (11.200 € → 3.600 € / Jahr)
- Trinkwasser Blei:
- < 0,001 mg/l (alle 6 WE, GW: 0,010 mg/l)
Wärmepumpe im Einrohr-Altbau
Wörther Straße, Prenzlauer Berg
Berlin-Prenzlauer Berg · 2025 · 12 Wochen
20-kW-Wärmepumpe mit hydraulischem Abgleich eines Einrohr-Systems, KWL in 6 Einheiten und Bleirohr-Inliner – in einem Gründerzeit-Haus von 1898 ohne einen einzigen Tag Mietausfall.
- Heizkosten:
- –65 % (14.000 € → 4.900 € / Jahr)
- CO₂-Ausstoß:
- –71 % (28 t → 8 t / Jahr)