References

Our projects

A selection of our work in Berlin – from heat pumps in period buildings to premium bathroom renovations.

Project photo
Heizung

Heat Pump in a Gründerzeit Period Building

Berlin-Charlottenburg · 2026

Installation of an air-to-water heat pump in a 4-unit period building from 1903. Including hydraulic balancing and radiator optimisation.

Project photo
Sanitär

Complete Design Bathroom Renovation

Berlin-Prenzlauer Berg · 2026

Premium bathroom renovation across 12 m² with walk-in shower, rain shower and smart home integration. Duration: 3 weeks.

Project photo
Klima

Multi-Split Air Conditioning for a Penthouse

Berlin-Mitte · 2026

3-room multi-split system by Daikin for a 140 m² penthouse. Including listed building authority coordination.

Project photo
Heizung

Heating Modernisation in an Apartment Building

Berlin-Neukölln · 2026

Replacement of a 30-year-old gas boiler with modern condensing technology. 8 residential units, funding via BEG.

Project photo
Sanitär

Accessible Bathroom with KfW Funding

Berlin-Steglitz · 2026

Age-appropriate bathroom conversion with walk-in shower, grab rails and non-slip floor. KfW grant secured.

Project photo
Klima

Controlled Ventilation System for a New-Build Villa

Berlin-Zehlendorf · 2026

Controlled residential ventilation with heat recovery for a 280 m² new build. Planning from shell stage.