Bathroom Renovation in Berlin

Complete bathroom refurbishment – turnkey.

A bathroom renovation in Berlin is a significant project – but with the right partner everything runs smoothly. We provide a complete turnkey service: from demolition through tiling and electrical work to the new sanitary installation. No coordination stress with multiple trades.

Affordable bathroom refurbishment in Berlin: where you really save and where you do not

Savings are made above all in the decisions taken before the first blow of the hammer. If the layout and the positions of the WC, washbasin and shower stay unchanged, the most expensive work is avoided: opening walls, laying new pipework, closing shafts again. A partial renovation with a new floor, replaced taps and renewed joints therefore comes to 2.000 to 6.000 Euro, and a small bathroom of 5 to 7 square metres with standard fittings to 8.000 to 12.000 Euro. The tile format also has a direct effect on the labour share, because large format tiles need a more even substrate and more time.

What you should not save on is the waterproofing, the pipework and the substrate. Labour costs in the Berlin plumbing and heating trade are around 60 to 100 Euro per hour, and tilers often charge 40 to 70 Euro per square metre of laid area. Anyone who cuts these items saves once and pays twice with the next moisture damage. In Gruenderzeit buildings (Berlin's late nineteenth century housing stock) we allow a contingency of 15 to 20 percent and show it separately in the quotation instead of hiding it in the square metre price. The price only becomes binding after the on-site appointment.

Bath out, shower in, or the whole bathroom straight away?

Both routes have their place. If the bath is the only problem and the tiles, the waterproofing and the pipework are intact, the conversion alone is enough: 3.500 to 5.500 Euro where the existing connections can be used, 6.000 to 9.500 Euro with a new level-access shower including tiling and waterproofing, and 9.500 to 14.000 Euro where walls are opened and pipework is relaid. If the drain has to be moved, another 500 to 1.500 Euro are added. In terms of time, the simple swap takes 2 to 3 days, and 5 to 10 working days with tiling and pipework.

As soon as the waterproofing layer has to be opened anyway, we set out the comparison: a bathroom of 8 to 10 square metres with good fittings comes to 15.000 to 25.000 Euro in total, and you have one building site instead of two within a few years. The floor construction is decisive. Above the structural floor, prefabricated shower elements require a build-up height of 6 to 12 centimetres, and a fall of 1 to 2 percent has to carry the water reliably to the drain. With timber joist floors we check before planning whether the floor may be lowered.

Bathroom refurbishment in Kreuzberg, Wedding or Steglitz: what the year of construction changes

Kreuzberg, Wedding and Prenzlauer Berg usually mean Gruenderzeit (Berlin's late nineteenth century housing stock): timber joist floors, thin or historic Estrich (floor screed), pipework of lead or old steel. Here the survey determines the price, not the catalogue. For a full refurbishment with renewed pipework, allow 15.000 to 35.000 Euro and 4 to 6 weeks, because strip out, chasing work and drying times run one after the other. The Estrich needs 3 to 5 days, the tile adhesive and the grouting another 2 to 3 days.

In Steglitz, Tempelhof or Lichtenberg the range is wider: estate housing of the 1920s and 1930s, residential high-rise blocks of the 1960s and 1970s and, in Lichtenberg, large Plattenbau estates (prefabricated concrete panel buildings) with concrete floors, fixed service shafts and windowless internal bathrooms. Where there is concrete instead of timber joists, the strip out is easier to plan, but the shaft then determines where the WC and the washbasin are allowed to go. If there is no window, ventilation belongs in the plan. If your building lies in a Milieuschutz area (a local statute protecting the existing resident structure), we clarify before planning whether the district authority has to be involved, and we align the specification with that.

Bathroom refurbishment in a rented flat or in a WEG: what has to be settled beforehand

As a tenant you need the landlord's consent for structural changes, in writing, before we order materials. As an owner in a WEG (Wohnungseigentuemergemeinschaft, the association of flat owners) the rule is: whatever touches jointly owned property, such as load-bearing floors or the drainage riser, requires a resolution. For that we supply the documents a Hausverwaltung (property management company) wants to see: a schedule of works, the planned interventions, the time window for isolating the riser and evidence of waterproofing in line with the recognised technical standards.

The second point is logistics. In inner-city Berlin there is rarely space in front of the building, so we clarify early on whether materials and a skip may stand in the courtyard and which staircase we will work from. These arrangements cost nothing, but they prevent days of standstill. Your quotation gets a separate item for them, so that you can see which share goes to site set-up and which to the actual trade work.

Bathroom refurbishment in Berlin: costs and construction time by scope

The following ranges show how the scope, the size of the bathroom and the building fabric affect the price and the construction time. We calculate every item after measuring up, so that you can see which share goes to materials and which to labour.

Scope of the refurbishmentTypical price rangeConstruction time
Partial renovation: new floor, replace taps, renew joints2.000 to 6.000 Euro1 to 2 weeks
Small bathroom of 5 to 7 square metres, standard fittings8.000 to 12.000 Euro2 to 3 weeks of actual construction time
Bathroom of 8 to 10 square metres, good quality of fittings15.000 to 25.000 Euro4 to 5 weeks including drying times
Full refurbishment with renewed pipework in a period building15.000 to 35.000 Euro4 to 6 weeks
Premium fit-out: designer tiles, branded taps, level-access shower30.000 to 50.000 Euro and above3 to 6 weeks plus planning
Single measure: bath out, shower in3.500 to 14.000 Euro2 to 3 days, or 5 to 10 working days with tiling and pipework
Level-access shower with floor milling and new Estrich5.000 to 10.000 Euro1 to 2 weeks

All figures are guide values for Berlin, not fixed prices. A binding quotation is only produced after measuring up during the on-site appointment, because the pipe routing, the Estrich and the building fabric determine the effort involved. In Gruenderzeit buildings we allow an additional contingency of 15 to 20 percent, and if the pipework has to be renewed the construction time can extend to 6 to 8 weeks.

Our services in detail

Complete turnkey service from a single source
3D bathroom planning in advance – you know exactly what will be created
All trades from one provider: plumbing, tiling, electrical
Brand collections from Duravit, Geberit, Grohe, Hansgrohe
Fixed-price guarantee after site survey – no hidden costs
Typical construction time: 2–3 weeks for a complete bathroom

Why Montali?

We combine academic analysis with master craftsman excellence. This means: well-thought-out planning, efficient execution and communication you might not expect from a trade company. As a Berlin master craftsman company, we take responsibility – from subsidy consulting to final sign-off.

Frequently asked questions about Bathroom Renovation in Berlin

Simple renovations start from approx. €8,000–12,000 (small bathroom, standard products). For mid-range quality in an 8–10 m² bathroom allow €15,000–25,000. High-end fit-out can exceed €30,000. We provide a transparent fixed-price quote after site survey.

A complete bathroom refit typically takes 2–3 weeks. Including screed drying times allow 3–4 weeks. We agree a binding schedule in advance.

Only if the property has no second bathroom or WC. We plan the work to minimise disruption to you as much as possible.

For bathroom renovations in existing buildings no building permit is generally required in Berlin. We will inform you promptly if any work involves load-bearing walls or floor-plan changes.

During the on-site appointment we record the areas, the quantities and the condition of the pipework, the Estrich (floor screed) and the waterproofing. From this come three separate blocks: labour, materials and site set-up. For labour, around 60 to 100 Euro per hour applies in Berlin in the plumbing and heating trade, while tilers often charge 40 to 70 Euro per square metre of laid area. We price the materials at the cost of the range you decide on. In Gruenderzeit buildings a separately stated contingency of 15 to 20 percent is added. Only then does the fixed price become binding; an estimate over the telephone remains an estimate.

Included are the strip out and disposal, the first fix for plumbing and electrics, the waterproofing, the Estrich, tiling and painting, the second fix of taps and sanitary ware, and the handover with a pressure test. Not included is work outside your own flat, such as the renewal of a shared riser, plus third party fees and wishes that come up after the order is placed. Such items get their own quotation, so that the agreed fixed price stays traceable. For a bathroom of 8 to 10 square metres with good fittings, the overall range is typically 15.000 to 25.000 Euro.

We stop at that point, document the finding with photographs and put a supplementary quotation to you before work continues. Typical findings in Berlin period buildings are pipework of lead or old steel, saturated Estrich and mould behind the old waterproofing. If this turns into a renewal of the pipework, the construction time extends to 6 to 8 weeks and the costs move towards a full refurbishment, that is 15.000 to 35.000 Euro. That is precisely why we show the period building contingency of 15 to 20 percent in the quotation from the outset.