Company holidays until 27/09/2026. Reply from 28/09/2026.

Back to Plumbing

Accessible Bathroom in Berlin

Age-appropriate bathroom design with funding options.

A barrier-free bathroom enables independent living in older age and is often vital for people with disabilities. We plan and build walk-in showers, grab rails, bath lifts and wheelchair-accessible sanitary installations – professionally, aesthetically and with subsidy advice on care-insurance grants and the KfW 159 loan.

Our services in detail

Walk-in showers and level-access entrances
Grab rails and support frames to DIN 18040
Wheelchair-accessible design to barrier-free standards
Care-appropriate fittings for people with restricted mobility
Subsidy advice: care-insurance grant up to €4,180 plus KfW loan 159
Discreet, aesthetic execution – no clinical appearance

Why Montali?

We combine academic analysis with master craftsman excellence. This means: well-thought-out planning, efficient execution and communication you might not expect from a trade company. As a Berlin master craftsman company, we take responsibility – from subsidy consulting to final sign-off.

Was kostet Accessible Bathroom in Berlin?

Typische Kosten

5.000 – 20.000 €

Dauer

1 – 3 Wochen

2 – 5 Wochen (inkl. Förderantrag und Planung)

KfW-Förderung 455 bis 6.250 €, Pflegekasse bis 4.000 €. Nettoeigenanteil oft unter 3.000 €.

Kostenfaktoren:

Umfang der Maßnahmen
Bodengleiche Dusche (Kernaufgabe)
Haltegriffe und Sicherheitstechnik
Türverbreiterung notwendig?
Pflegegrad des Nutzers (Fördervoraussetzung)

Frequently asked questions about Accessible Bathroom in Berlin

Care-insurance funds provide grants of up to €4,180 per person for those with a recognised care level. The former KfW grant 455-B has been discontinued; the low-interest KfW loan 159 is available instead. We handle the applications.

Yes – targeted measures such as a walk-in shower, grab rails and a raised toilet are often sufficient. We assess on site which measures are practical and eligible for funding.

Depending on scope, 1–3 weeks. Targeted individual measures (e.g. only grab rails and raised toilet) are often completed in 1–2 days.

Project photo 1
Project photo 2