Zurück zu Heating
Heat Pump in Tempelhof

Heat Pump in Tempelhof installieren

SHK-Betrieb in Tempelhof – Heizungsinstallation, Rohrsanierung und Klimatechnik im Berliner Süden.

Heat Pump in Tempelhof – Wichtige Infos und Kosten

Tempelhof has a distinctive profile: on one hand traditional working-class neighborhoods with period rental buildings, on the other hand the vast green space of Tempelhof Field and modern new construction neighborhoods. Our primary focus in Tempelhof is on period building renovation in areas south of the Kurfürstendamm extension: heating modernization, pipe renovation, and ventilation systems for apartments with living-room-height ceilings and large spaces. In the area around Columbiadamm and the new 'Urban Spree' development, we also work with modern commercial properties and advise on efficient climate control solutions. The flat terrain around Tempelhof Field provides ideal conditions for geothermal projects – heat pumps with borehole heat exchangers are a popular and sustainable solution here.

✨ Ideale Heat Pump-Lösung für Tempelhof

Tempelhof: In the 1920s settlements (New Building), we combine heat pumps with hydraulic renovation – hydraulic balancing is often the key to 20-30% energy savings. New constructions around Tempelhof Field are centrally prepared for heat pump systems. In the south (Mariendorf), heat pumps assist with commercial ventilation projects.

📍 Tempelhofer Feld📍 Herrfurthplatz📍 Mariendorf

Heat Pump in Tempelhof – Kosten & Förderung

Typische Kosten

12.000 – 25.000 €

Dauer

2 – 4 Tage

3 – 6 Wochen (inkl. Planung, Genehmigung, Inbetriebnahme)

Mit BEG-Förderung (bis 70 %) sinkt Ihr Eigenanteil oft auf 4.000 – 9.000 €.

Process: Heat Pump Installation in Tempelhof

1

1. Free Consultation

Non-binding on-site visit with heat load calculation and measurements

2

2. Fixed Price Quote

Transparent, no hidden costs – including funding consultation (BEG up to 70%)

3

3. Funding Request

We submit the BEG application for you – maximum funding guaranteed

4

4. Professional Installation

2–4 days installation by experienced masters, minimal disruption to your daily life

5

5. Commissioning & Maintenance

Professional commissioning with documentation, free first maintenance after 12 months

All Questions Answered

Yes – we install air-water and brine-water heat pumps throughout Berlin, including Tempelhof. With over 10 years of experience, we understand local conditions precisely: sound protection in sensitive areas, monument-protected facades, permit procedures at the district authority, and typical old-building challenges. We coordinate all government approvals – you don't need to worry about anything.

Total costs for an air-water heat pump in Berlin's old buildings range from €12,000 to €25,000, depending on building size, insulation standard, and whether piping needs replacement. Cost breakdown: Heat pump unit €5,000–8,000, buffer storage €1,500–2,500, installation & pipes €3,000–8,000, hydraulic balancing & commissioning €500–1,500. With BEG funding (up to 70% grant), your share often drops to just €4,000–9,000. We provide a transparent fixed-price quote after free heat load calculation.

Yes – Tempelhof has many period buildings from the Wilhelmine and Founder eras (1880–1930) with sometimes original heating systems. Modern heat pumps work very efficiently even with 55–60 °C flow temperatures. In most old buildings, the radiators are adequately sized. We check for free on-site whether your radiators are sufficient or if hydraulic balancing is needed. Often, only heating surface supplement (e.g., underfloor heating in bathroom) is required – no complete overhaul necessary.

Process: (1) Free on-site visit with detailed survey, heat load calculation, and planning of outdoor unit position – about 1–2 hours. (2) Transparent fixed-price quote with schedule. (3) Funding application: We submit all BEG applications for you; approval takes 2–4 weeks. (4) Installation: 2–4 days on-site with minimal disruption. (5) Commissioning and comprehensive operating instructions. (6) Free first-year maintenance. Total timeline from consultation to operation: 8–12 weeks.

Free Consultation

Heat load calculation and fixed price quote – non-binding and free.

Call NowSubmit Request

5.0 out of 5 stars

19 Google Reviews